  • Subsidy of Rs. 30,000/- for 1 KW system.
  • Subsidy of Rs. 60,000/- for 2 KW system
  • Subsidy of Rs. 78,000/- for 3 KW and higher system

If you are associated with “Mukhyamantri Nishulk Bijli Yojana” , then the Rajasthan State Government will give you an additional subsidy of Rs 17000/-.

CONCESSIONAL BANK LOAN FOR PM SURYAGHAR (ROI Starting at 6.75%)

Concessional Bank Loans ( All Govt. Banks are providing loans for Surya Ghar Yojana. The interest rate is starting from 6.75%).

Loan Amount is up to 2 Lacs for Project up to 3KW and 6 Lacs for projects more than 3 KW and up to 10 KW.

DIRECT BENEFICIARY TRANSFER OF SUBSIDY

The subsidy will be transferred to consumer account within 30 days of Project commissioning by Discom (As per Guidelines)

POINTS TO BE TAKEN CARE

 The subsidy will be available only if the project is being installed by Empanelled Vendor.

Assess the vendor based on his previous sites and reviews from existing customers.

Considering the life of 25 Years, quality and after-sales service should be given priority over the price for long-term peace of mind.

Indicative Bill of Materials for standard package of Rooftop Solar Plant under Subsidy Scheme :

Solar PV PanelAs per MNRE specification/standards and registered in ALMM
Grid Connected InverterAs per MNRE/BIS Standard regulations
Module Mounting Structure (MMS)Galvanized as per applicable IS
Structure AccessoriesStainless Steel 304
Net Meter and Solar meterAs per DISCOM requirements
Array Junction BoxProtection as per Inverter requirement
AC Distribution BoardProtection as per Inverter & DISCOM/Grid requirement
Solar DC CablesTotal 50 metre in length and as per MNRE Specification
AC CablesMNRE specifications
EarthingAs per MNRE specifications
Lightning ArrestorMNRE specifications
Earthing Cable / StripMNRE specifications
Connectors, Conduit pipes etcMNRE specifications
Installation Testing & CommissioningAs per safety norms of SERC/ CEA
Performance TestingMinimum 75%
O&M and Warranty5 Years from the date of commissioning